5-22-19

5-22-19:  Went to the field to install the new combination locks and to inspect the field conditions after the Field Prep and Clean-up held on 5-15-19. It was raining when I opened the gate and the field looked like it wasn’t touched all year.  Due to the continuing rain since the Field Prep  and Clean-up the grass was long and the weeds were standing vertical and the soil condition was water logged. It appeared that another cut was needed as soon as possible just to control the fast growing grass and weed. See Photos below

photos by Pete M